Friday, 2 March 2012

The small jobs are really the BIG jobs


Timber for the base of the battery box I think it may be close to being finished


Secured in 


Dome nuts


Finely the shunt arrives and mounted to the acrylic, I made up 2 BUS bars to connect the fuse with the shunt 


From the side 


Battery box bolted back into the frame with Pot box and main contactor 


Put 50mm lugs on the connectors to check cable won't interfear or fowl when in place




No comments:

Post a Comment