Timber for the base of the battery box I think it may be close to being finished
Secured in
Dome nuts
Finely the shunt arrives and mounted to the acrylic, I made up 2 BUS bars to connect the fuse with the shunt
From the side
Battery box bolted back into the frame with Pot box and main contactor
Put 50mm lugs on the connectors to check cable won't interfear or fowl when in place
No comments:
Post a Comment