Monday, 21 January 2013

Are we there yet?


Well the frame to house the battery box is almost complete these photos will require you to play twister with your head. the bracing is done and just tacked together as the whole structure now has to get engineering approval and I anticipate a few changes will be required. The box full of batteries is required to withstand a 20 G frontal impact and a 10 G side or rear impact and remain in-tacked and not break away from the car. I found I just had to make the thing as I couldn't describe or draw it well enough to get the engineers specifications.


Ok here we are looking up at the support which in turn is welded to the angle iron bolted to the extended seatbelt bolts you can also see the strut on the right which bolts to the body.


Camera angled up a bit more you see the support tacked to the angle 


This dog leg brace will need to be made in a thicker material 6mm not 3mm with a diagonal drace welded behind 


Again the dog leg is required to clear the box


The other side brace again different because the under body of the car is not symmetrical 








Hows your neck?
Thanks for looking, Rob

Saturday, 12 January 2013

That BOX!


After 3 different models and 2 attempts to construct I have completed the battery box, it will hold 24 Thunder-sky 100 amp batteries laying on edge providing me with half of the final pack voltage of (144 Volts)


Steel Rivets used as the Registration inspectors won't accept aluminium 


Part of the pivoting rack for the box. This will drop down and allow the battery box to slide out as a cartridge so I can use it on my yet to come E-Boat/party pontoon but still leave a second 72 Volt pack in the car for driving


Box nice and snug in rack





This shows the box about to be slid up into place 


And sits up nice and neat


not a lot of room between the shocker mounts 


And the clearance at the front of the box, needs to accommodate the park brake cables 


Cut 45 mm off the hight of the box  


Looking at where the back seat bolts in you can see the inspection hole for the old fuel tank pump just above and too either side to the rear are the seat belt mounting bolts I have tapped the tread to a larger 12 x 1.75 mm and put new high tensile bolts in that are 20 mm longer so I can bolt a mounting system under the car for the box 



The original bolts tightened flush with the nuts now 20 mm of thread protrudes for mounting bracket I have almost finished the mounting system however I can't get the camera far enough away from the car to get a picture!











  Cheers

Wednesday, 2 January 2013

40 C in the shed I'm out here


Early start this morning because of heat however Controller, Main Contactor and Auto Precharge resister installed. I had good intentions to keep going but an early start tomorrow morning is on the list. 

Now What is This Korkie???

Adding a second story for the controller


This will allow the main contactor to sit under the controller



Then I can use short brass buss bars for some of the connections


Like This


Next the precharge resistor to protect the controller


Looking like this


and put back in the engine bay

\

Next project hot water, showing the electric water pump from a 2005 VW $20 from Ebay


Cheers


Tuesday, 1 January 2013

Peripherals, small update


Had good intentions today but it's new years day I'm in recovery mode and it's to dam hot in the shed so only a couple of things done. The first in was a check to see the braket for the gear linkages and cables fit all ok.


Next a small braket and cable holder then mount the Pot Box, why do the teenages ears prick up every time I say Pot Box?


That will do for today. Cheers



Friday, 28 December 2012

Doctor, the operation was a success

Adaptor plate and assembly bolted to motor


Closer view so you can see my rough work


First coupling on motor shaft


Second coupling to attach to the gearbox input shaft


Assembly showing complete coupling and rubber "spider'


Gearbox connected to motor 


Hoisted on to work bench for inspection, yep the work bench is rated at 25 kgs. weight  and it's holding up at 80 kgs. Still have chain and hoist 


Oh, that's right turn it around the right way


Several hours of argy bargy 


Snug fit with 7mm to spare, well to tell the truth I had to cut 22 mm off of the motor aux shaft.


Modified the existing engine mount and yes a cigarette paper tight fit. 


Another view of the engine mount I know Dennis will be looking. Mad man is converting the same car


Controller and main contactor


Gearbox mount doing it's job



How do I tighten the grub screws on the coupler? 


That's right just drill a 50mm hole in the bellhousing


Yep I'm going to put an old orange bath plug with a chain in there 


Back to work tomorrow